16 August 2025
Category
Tailcone
Time Spent
1hrs 30mins
Progress
Total hours month:
Days since start:
Est. Complete:

S10-13, Step 5-7

Today was mostly about aligning and drilling. I worked with both F-1011D (Attachement Bar Support Angle) and F-1012D (Up Elevator Stop), which were aligned, drilled, match drilled, final sized and clamped to both F-1014 (Aft Deck) and F-1032 (Longerons). End holes through Longerons were upsized to #12 (to accomodate for the AN3 bolts) , whilst other holes prepped with #30 for the AD4 rivets.